Portfolio

RENDON ST. WAREHOUSE PHASE I AND PHASE II - NEW ORLEANS, LOUISIANA

Size: 40,000 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, Plumbing and Fire Suppression systems.

The project consisted of re-purposing an existing server room grade HVAC system to provide a specialized environment where the curating of fine art will take place.

Client: Perez, New Orleans Louisiana

close

PINKBERRY VILLAGE DINING AUBURN UNIVERSITY - AUBURN, ALABAMA

Size: 1,500 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the Plumbing system.

Client: Holden Architects, Baton Rouge Louisiana

close

BIM CONST. COORDINATION OF OPSO INTAKE PROCESSING CENTER - NEW ORLEANS, LOUISIANA

Size: 425,000 sq. ft.

Responsibility:

Utilizing the published construction documents prepared by the project design team, EMB fully modeled all hydronic piping and ductwork in Revit. Attending weekly BIM coordination meetings, EMB coordinated the duct and pipe route with all other trades to avoid collisions during construction.

Client: CSI

close

BENJAMIN FRANKLIN HIGH SCHOOL CAFETERIA HVAC RENOVATION - NEW ORLEANS, LOUISIANA

Size: 3,100 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC system.

Client: Benjamin Franklin High School

close

MASSAGE ENVY - METAIRIE, LOUISIANA

Size: 3,100 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction administration of the HVAC, Plumbing and Fire Suppression systems for the project.

Client: Metro Studio LLC, New Orleans Louisiana

close

SHILOH MISSIONARY CHRUCH - WESTWEGO, LOUISIANA

Size: 22,900 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, Plumbing and Fire Suppression systems.

Client: Lee Consulting Engineers Inc., Baton Rouge Louisiana

close

LSU RENOVATION OF SWING SPACE HATCHER HALL - BATON ROUGE, LOUISIANA

Size: 9,000 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, and Plumbing systems.

Client: GD Architects, Baton Rouge Louisiana

close

NEW FACILITY FOR SCHOTTEL - NEW ORLEANS, LOUISIANA

Size: 16,000 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction administration of the HVAC, and Plumbing system for the project.

Client: Metro Studio LLC, New Orleans Louisiana

close

ADDITIONS AND RENOVATIONS TO NORTH ST. ELEMENTARY - NEW IBERIA, LOUISIANA

Size: 5,500 sq. ft. Total Project3,300 sq. ft. Addition2,200 sq. ft. Renovation

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, Plumbing and Fire Suppression systems.

Client: Architects Design Studio, New Iberia Louisiana

close

THE REFRESH PROJECT - NEW ORLEANS, LOUISIANA

Size: 56,000 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, Plumbing and Fire Suppression systems.

All systems were designed so the whole facility could act a shell space for future tenants.

Known future tenants are Whole foods, Tulane kitchen

Client: Metro Studio, New Orleans Louisiana

close

LSU AG CENTER RENOVATION TO DEAN LEE RESEARCH STATION - ALEXANDRIA, LOUISIANA

Size: 3,100 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, and Plumbing systems.

Client: GD Architects, Baton Rouge Louisiana

close

LOUISIANA MEDICAL CLINIC - BATON ROUGE, LOUISIANA

Size: 7,000 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, Plumbing, Fire Suppression and Medical Gas systems.

Coordination of all mechanical systems with facilities’ MRI.

Client: Holden Architects, Baton Rouge Louisiana

close

WALK ON’S CATERING SEWER TREATMENT PLANT REPORT - BATON ROUGE, LOUISIANA

Size: 40,000 Gallon per Day Plant

Responsibility:

Verified the available capacity of the existing 40,000 gallon per day sewer treatment plant serving the property.

Client: B2 Design LLC., Baton Rouge Louisiana

close

HANO FLORIDA AVE. NEW AFFORDABLE HOUSING 56 UNITS - NEW ORLEANS, LOUISIANA

Size: 128,960 sq. ft. (52 units @ approx. 2,480 sq. ft. per unit.)

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, Plumbing systems.

The design had to meet all specified requirements of the Housing Authority of New Orleans.

The project’s time line was extremely compressed due to unforeseen forces outside the control of the design team. EMB was able to closely work with the Architect and Design team members to meet all deadlines.

Client: Perez, New Orleans Louisiana

close

WEATHERFORD GAS LIFT OFFICE AND SHOP FACILITY - BROUSSARD, LOUISIANA

Size: 86,000 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, Plumbing and Fire Suppression systems.

Ever changing client needs made the completion of this project a moving target. EMB was able to manage and document these changes all in Revit.

Client: Architects Design Studio, New Iberia Louisiana

close

411 BURLESQUE LLC - NEW ORLEANS, LOUISIANA

Size: 1,000 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, and Plumbing systems.

Client: Metro Studio LLC, New Orleans Louisiana

close

SKANSKA / MAPP TEMP OFFICE - NEW ORLEANS, LOUISIANA

Size: 15,000 sq. ft

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, and Plumbing systems.

Client: Metro Studio LLC, New Orleans Louisiana

close

VILLE PLATTE COURTHOUSE CHILLER REPLACMENT - VILLE PLATTE, LOUISIANA

Size: 350 Tons

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the replacement of two air cooled chillers and two chilled water air handlers.

Client: J. Ronald Landreneau & Associates, Inc., Ville Platte Louisiana

close

NEW RESTAURANT FOR R & M’S BOILING POINT - NEW IBERIA, LOUISIANA

Size: 5,800 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, Plumbing and Fire Suppression systems.

Client: Architects Design Studio, New Iberia Louisiana

close

BRUSLY POLICE HEADQUARTERS - BRUSLY, LOUISIANA

Size: 6,400 sq. ft.

Responsibility:

Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, and Plumbing systems.

Every member of the design team used Revit for this project. EMB was able to utilize the clash detection function of Revit to coordinate this project.

Client: Holden Architects, Baton Rouge Louisiana

close

RENOVATIONS TO IBERIA PARISH COURTHOUSE ANNEX BUILDING - NEW IBERIA, LOUISIANA

Size: 9,700 sq. ft.

Responsibility:

  • Engineering, Design, Construction Document preparation and Construction Administration of the HVAC, Plumbing and Fire Suppression systems.
  • The existing renovated area is located on the first floor of the Iberia Parish courthouse annex building. Bar joist and tight floor to floor dimensions made coordination of the new mechanical with the existing conditions critical. EMB was able to produce a rough Revit model of the existing building. Using this rough model we were able to coordinate the new mechanical system design with the existing building components.

Client: Architects Design Studio, New Iberia Louisiana

close